System Production Flow







IPQC
Veriies that all the production processes
are completed correctly and accordingly to
speciication.





Visual Inspection Basic
Once systems have been assembled, they will have Visual IPQC Function Test
already been visually inspected. Our inspectors ensure Inspection Dynamic
all components and accessories are assembled properly Burn In
and follow MFG before testing. Assembly



Advanced
Assembly Kiting System Production Flow Function Test
Makes certain that all the system Material
components were assembled properly (Main
board, Cable, Fan, HDD, etc.)

Shipping Packing

Shipping OQC In FQC
In order to meet the demands of storage, transportation, loading and unloading Warehouse
the products mechanically, our pallet stretch wrap machine is designed to enhance
production eficiency and prevent damage to the products during transportation.



OQC
To implement QC inspection procedure on packaged and
inished goods, OQC has the MILā€“STD 105E Table. QC
staff conducts sampling according to required sampling by
quantity.




















Certifications Certifications
Portwell has been certified with ISO 14001 compliance by TUV NORD
Portwell has been certified with ISO 9001 and TAF compliance by
since 2010. Portwell follows the ISO 14001 standard as a fundamental
TUV NORD and UCS organizations since 2006. This certifies that
Portwell implements an ISO-9001 quality system and is committed to principle. The overall goal is the concept of continuous improvement as
continuous improvement. well as commitment to the Plan-Do-Check-Act methodology.