Page 5 - Ver. 215S_All
P. 5
Basic Function Test
In order to ensure the system product is able to boot up by
Dynamic Burn-In, 100% of the system products are tested
for electronic functionality via a Basic Function Testing after
assembly.



Dynamic Burn In Test
IPQC Basic DBI is the test used before the product is
Function Test shipped out. The purpose is to screen possible
Dynamic weaknesses and failures which affect its reliability
under different environments.
Burn In




Advanced Advanced Function Test
Production Flow Function Test This procedure is to ensure the quality
and functionality of the system product
after the Burn-in test.


Packing


In FQC Packing
Warehouse We inspect the product for external defectiveness.
Once they have passed, we then collocate all
accessories into plastic bags then proceed with
boxing and labeling.




FQC
Finished and packed goods are placed in this area for
inspection; the FQC department will inspect inished goods
based on standard procedures.


OHSAS (Occupational Health and Safety Assessment Series) 18001 is
a standard which deines a set of requirements for a safety management
 Certiication--OHSAS system.

OHSAS 18001 is compatible with ISO 9001 and ISO 14001. It covers
issues such as:
1. Planning for hazard identiication
2. Risk assessment/control
3. OHS (Occupational Health and Safety) management, awareness and
competence, training, communication, emergency preparedness and
Certiications response, performance measuring and improvement.
Portwell achieved OHSAS 18001:2007 certiication by the OHSAS OHSAS 18001 is compatible with ISO 9001 and ISO 14001. It covers
organization in 2010 and also TOSHMS: 2007 during the same year. issues such as:
Both certiications represent a high regard for labor safety, commitment 1. Planning for hazard identiication
to employees’ health management and continuous improvement for 2. Risk assessment/control
3. OHS (Occupational Health and Safety) management, awareness and
the company and society. competence, training, communication, emergency preparedness and
response, performance measuring and improvement.

System Production Flow 04
   1   2   3   4   5   6   7   8   9   10