System Production Flow








IPQC
Verifies that all the production processes
are completed correctly and accordingly to
specification.




Visual Inspection
Once systems have been assembled, they will have Visual Basic
already been visually inspected. Our inspectors IPQC Function Test
ensure all components and accessories are Inspection Dynamic
assembled properly and follow MFG before testing.
Assembly Burn In



Advanced

Assembly Kiting System Production Flow Function Test
Makes certain that all the system components Material
were assembled properly (Main board, Cable,
Fan, HDD, etc.)
Packing
Shipping

Shipping OQC In FQC
In order to meet the demands of storage, transportation, loading and Warehouse
unloading the products mechanically, our pallet stretch wrap machine is
designed to enhance production efficiency and prevent damage to the
products during transportation.



OQC
To implement QC inspection procedure on packaged and
finished goods, OQC has the MILā€“STD 105E Table. QC staff
conducts sampling according to required sampling by
quantity.

















Certifications Certifications
Portwell has been certified with ISO 9001 and TAF compliance by TUV Portwell has been certified with ISO 14001 compliance by TUV NORD
NORD and UCS organizations since 2006. This certifies that Portwell since 2010. Portwell follows the ISO 14001 standard as a fundamental
implements an ISO-9001 quality system and is committed to continuous principle. The overall goal is the concept of continuous improvement as
improvement. well as commitment to the Plan-Do-Check-Act methodology.