Page 5 - Ver_216P
P. 5
Basic Function Test
In order to ensure the system product is able to boot up by
Dynamic Burn-In, 100% of the system products are tested for
electronic functionality via a Basic Function Testing after assembly.





Dynamic Burn In Test
DBI is the test used before the product is shipped
IPQC Basic out. The purpose is to screen possible weaknesses
Function Test and failures which affect its reliability under different
Dynamic environments.
Burn In




Advanced Advanced Function Test
Production Flow Function Test This procedure is to ensure the quality
and functionality of the system product
after the Burn-in test.



Packing


In FQC Packing
Warehouse We inspect the product for external defectiveness.
Once they have passed, we then collocate all
accessories into plastic bags then proceed with
boxing and labeling.




FQC
Finished and packed goods are placed in this area for
inspection; the FQC department will inspect finished goods
based on standard procedures.





28000 14064











Certifications Certifications
Portwell has been ISO 13485 certified by TUV NORD since 2010. In Portwell has been ISO/TS 16949 certified by TUV NORD since 2014.
addition to Portwell’s headquarters in Taiwan, her branch office in the Following ISO/TS 16949 specifications, Portwell has developed a quality
U.S has also achieved the same certification which reflects Portwell’s management system that provides continual improvement, defect
dedication to continuous improvement in the design and manufacturing prevention and reduction of variation in serving automotive-related
of medical computing devices. products.

System Production Flow 4
   1   2   3   4   5   6   7   8   9   10